DATA
TAKING STATUS
Luminosity counting start time: 20/11/06
Start run for productions: 3500
03.01.07
Data
taking reprise after straight cosmic rays data taking - He bag emptied
and refilled.
2007
data from run 5147.
14.01.07
BUG
on run control program found - TRIGGER WRONG DESCRIPTION
Possible
mismatches of trigger declared on electronic logbook and effective
working trigger.
For
runs prior to
this date check always the pattern unit trigger to infer the actual
trigger of the run. The problem should affect single runs only,
recorded after automatic sequences (no correct update of the
running condition upon SETUP).
18.01.07
Severe worsening of He chamber
operating conditions: 25% upper sectors, 80% in sector #6.
From
run 6071.
03.02.07
No
silicon detectors found in runs:
- 6282 - 6312
- 6172 - 6165 (roughly: interval
to be refined)
13.02.07
Severe troubles to
the machine chryogenic system and FINUDA magnet. Start of straight
cosmic rays data taking. LAST GOOD HYPE RUN: FINU07671. Straight cosmic rays
data taking runs COSM05977->COSM06019
02.03.07
ISIM module #2 damaged by beam loss.
Switched off since run 8163 (included).
09.04.07
The FINU runs in the following list
must be treated properly (the current trigger may be different
from the one requested upon data taking, and th enumebr of
events is irregular):
- FINU10736 BHA 153504 events
- FINU10737 BHA 51448 events
- FINU10738 BHA - trash
- FINU10739 BHA 14700 events
- FINU10740 HYP run containing
BHABHA events
- FINU10741 HYP 98495 events but DAQ
froze probably before closing the file: the file is almost
empty
11.04.07
LMD chamber #7 and (partly) #8
missing in the FINU runs
due to hardware problem (broken fuse
on a discriminator)
15.04.07
Half STRAW channels off in the runs:
|