 Requested
  Approved - Main User
  Approved - Co-user
 CANCELLED

 
Start End User Group Leader Rollin/out (h) beam (days) dose Min. Energy Max. Energy Particle Min. Mult. Max. Mult. Info Priority Beamline
2014-02-03 2014-02-10 tof_diamonds Roberto Cardarelli 6 7 0.0 300.0 500.0 Electron 1.0 1.0 Main user   BTF
2014-02-10 2014-02-17 MU2E Ivano Sarra 6 7 0.0 50.0 500.0 Electron 1.0 3.0 CANCELLED Main user
2014-02-17 2014-02-24 UA9 Gianluca Cavoto 24 7 1.0 500.0 500.0 Electron 1.0 10.0 CANCELLED - long pulse tests Co-user
2014-02-17 2014-02-24 JLAB12-RICH Vincenzo Lucherini 6 7 0.0 500.0 500.0 Electron 1.0 5.0e+3 CANCELLED - Setup of GEM trackers, commissioning Main user
2014-02-24 2014-03-03 BTF-CHAOS Luca Foggetta 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 PARTIALLY CANCELLED - !CHAOS at the BTF Main user   BTF
2014-03-03 2014-03-10 VIPIX L. Servoli 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 CANCELLED Main user
2014-03-03 2014-03-10 MIMOSA Spiriti Eleuterio 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 CANCELLED Co-user
2014-03-10 2014-03-17 MEGII Francesco Grancagnolo 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 We will be located immediately after the MEG Active Target Test. We will need gas lines (Helium and Isobutane), linac trigger, standard NIM modules and crate, low voltage power supply Main user   BTF
2014-03-17 2014-03-24 MEG-ATAR Gianluca Cavoto 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 We would like to be either in the week following or in the week before the week given to MEG-II Main user   BTF
2014-03-24 2014-03-31 Diamonds LHC Florian Burkart 6 7 0.0 500.0 500.0 Electron 1.0 1.0e+7 Detailed description will follow this week via mail to btf@lnf.infn.it. Main user   BTF
2014-03-31 2014-04-07 JLAB12-RICH Vincenzo Lucherini 24 7 1.0 500.0 500.0 Electron 1.0 10.0 Possible long time for Roll-in/out in case of use of the Big Black Box as in the tests of last July, since its installation/removal requires access to the experimental hall using the main door. Main user   BTF
  2014-04-07   2014-04-14   JLAB12-RICH   Vincenzo Lucherini   24   7   1.0   500.0   500.0   Electron   1.0   10.0   test continuation   Co-user   BTF
2014-04-07 2014-04-14 UA9 Gianluca Cavoto 24 7 1.0 500.0 500.0 Electron 1.0 10.0 Test and calibration of final Cherenkov radiator for SPS Main user   BTF
2014-04-15 2014-04-18 C-SPEED Marcello Piccolo 6 3 0.0 500.0 500.0 Electron 0.0 0.0 [on hold from 2013] Main user   BTF
2014-04-22 2014-04-25 BTFstaff Paolo Valente 6 3 0.0 500.0 500.0 Electron 1.0 1000.0 long pulse tests CANCELLED Main user
2014-04-28 2014-05-05 CMSECALUP Paolo Meridiani 6 7 0.0 300.0 750.0 Electron 100.0 1000.0 Test di piccolo prototipo di calorimetro shashlik per ECAL upgrade Main user   BTF
2014-05-05 2014-05-10 FAMU Andrea Vacchi 6 5 0.0 100.0 500.0 Electron 1.0 1000.0 Main user   BTF
2014-05-12 2014-05-19 ITS Paolo Martinengo 6 7 0.0 500.0 750.0 Electron 1.0 1000.0 We aim at testing prototype pixel chips for the upgrade of the Inner tracking of the ALICE experiment. Main user   BTF
2014-05-19 2014-05-26 IMCP Paolo Meridiani 6 7 500.0 750.0 750.0 Electron 1.0 1000.0 Main user   BTF
2014-05-26 2014-06-03 PP@LPA Riccardo Faccini 6 8 0.0 500.0 500.0 Electron 1.0 1000.0 neutron and charged production Main user   BTF
2014-06-03 2014-06-09 BTFstaff Paolo Valente 6 6 0.0 500.0 500.0 Electron 1.0 1000.0 micro-bunching tests CANCELLED Main user
2014-06-09 2014-06-16 BTF-CHAOS Luca Foggetta 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 !CHAOS test with BEAM Main user   BTF
2014-06-16 2014-06-23 ITS Paolo Martinengo 6 7 0.0 500.0 750.0 Electron 1.0 1000.0 Our goal is testing prototype pixel chips for the upgrade of the Inner Tracking system (ITS) of the ALICE experiment Main user   BTF
2014-06-23 2014-06-30 JLAB12 Guido Maria Urciuoli 6 7 100.0 500.0 500.0 Electron 1.0 1.0 Main user   BTF
2014-06-30 2014-07-07 VIRHIS Massimo Zambelli 6 7 0.0 27.0 27.0 Electron 1.0 1000.0 Main user   BTF
2014-07-07 2014-07-14 atlasmup c. gatti, m. antonelli 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 turno a recupero periodo non effettuato a novembre Main user   BTF
2014-07-14 2014-07-21 INSUB Michela Prest 4 7 100.0 100.0 500.0 Electron 1.0 10.0 Main user   BTF
2014-07-21 2014-07-28 GAMMA-400 Valter Bonvicini 6 7 0.0 50.0 750.0 Electron 1.0 1000.0 Test of: 1. a prototype of calorimeter made by cubic CsI(Tl) crystals read-out by silicon photodiodes. 2. a small prototype of converter/tracker (W foils/silicon microstip detectors) Main user   BTF
2014-07-28 2014-08-04 MEG2 Flavio Gatti 6 7 0.0 50.0 50.0 Positron 1.0 1.0 Main user   BTF
2014-08-05 2014-09-07 BTFstaff Paolo Valente 0 33 0.0 500.0 500.0 Positron 999.9 1.0e+7 summer shutdown Main user
2014-09-08 2014-09-15 tof_diamonds Roberto Cardarelli 6 7 0.0 500.0 750.0 Electron 1.0 1.0e+7 Main user   BTF
2014-09-15 2014-09-22 PICO Martino Marisaldi 6 7 24.0 400.0 500.0 Electron 1.0 3.0 Max number of events to be collected ~10^6 (3 full days of acquisition in single electron mode). One day before and after tests for installation / de-installation. Earliest date for experiment: September 2014. Additional information on the experiment s Main user   BTF
  2014-09-22   2014-09-29   MIMOSA   Spiriti Eleuterio   6   7   0.0   500.0   500.0   Electron   1.0   1000.0   recupero   Co-user   BTF
2014-09-22 2014-09-29 VIPIX L. Servoli 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 recupero Main user   BTF
2014-09-29 2014-10-06 PADME Paola Gianotti 6 7 0.0 500.0 500.0 Positron 999.9 1.0e+7 from 10^4 to 10^10 DIAMONDS tests for beam dump experiment Main user   BTF
2014-09-29 2014-10-06 CRYSBEAM Gianluca Cavoto 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 CANCELLED - Test of special silica radiators manufactored with ultra fast laser. Test of scintillators at low temperature Main user
2014-10-06 2014-10-13 BTFstaff Paolo Valente 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 micro-bunching tests - recupero Main user   BTF
2014-10-13 2014-10-20 MEGII Francesco Grancagnolo 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 Main user   BTF
2014-10-20 2014-10-27 Pixel-tracker Spiriti 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 Main user   BTF
2014-10-20 2014-10-27 IMCP Paolo Meridiani 6 7 500.0 500.0 500.0 Electron 1.0 1000.0 CANCELLED Main user
2014-10-27 2014-11-03 B2ECL Pasquale Lubrano 6 7 0.0 100.0 500.0 Electron 1.0 5.0 recupero Main user   BTF
2014-11-03 2014-11-10 BTFstaff Paolo Valente 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 long pulse tests - recupero Main user   BTF
2014-11-10 2014-11-17 SIDDHARTA/AMADEU Catalina Petrascu 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 recupero Main user   BTF
2014-11-17 2014-11-24 MU2E Ivano Sarra 6 7 0.0 50.0 500.0 Electron 1.0 3.0 recupero Main user   BTF
  2014-11-24   2014-12-01   dBLM   florian burkart   8   7   999.9   500.0   500.0   Electron   999.9   1.0e+7   detailed request will follow.   Co-user   BTF
2014-11-24 2014-12-04 PADME Paola Gianotti 6 10 0.0 500.0 500.0 Positron 999.9 1.0e+7 from 10^4 to 10^10 background tests for beam dump experiment beam dump required, additional shielding required Main user   BTF
2014-12-04 2014-12-15 AMY Valerio Verzi 6 11 0.0 510.0 510.0 Electron 999.9 1.0e+7 evaluate the feasibility of beam debunching Main user   BTF


Year: 2014 Total days with accepted=1: 261