Start
| End
| User
| Group Leader
| Rollin/out (h)
| beam (days)
| dose
| Min. Energy
| Max. Energy
| Particle
| Min. Mult.
| Max. Mult.
| Info
| Priority
| Beamline
|
2011-02-14 |
2011-02-21 |
TPS |
Alessandro Paoloni |
6 |
7 |
0.0 |
500.0 |
500.0 |
Electron |
1.0 |
1000.0 |
|
Main user |
  BTF |
2011-02-21 |
2011-03-07 |
SIDDHARTA/AMADEU |
Catalina Petrascu |
6 |
14 |
0.0 |
500.0 |
500.0 |
Electron |
1.0 |
1000.0 |
test of detectors for SIDDHARTA2 and AMADEUS |
Main user |
  BTF |
  2011-03-07 |
  2011-03-21 |
  RAINPC |
  Srdjan Petrovic |
  10 |
  14 |
  0.0 |
  500.0 |
  500.0 |
  Positron |
  1.0 |
  1000.0 |
  The avaible beam time will be also used by Dr Yuri Chesnokov as a second user for his VEER project. |
  Co-user |
  BTF |
2011-03-07 |
2011-03-21 |
VEER |
Yury Chesnokov |
5 |
14 |
999.9 |
100.0 |
500.0 |
Positron |
1.0 |
1000.0 |
we have to work as co -users
with RAINPC project |
Main user |
  BTF |
  2011-03-21 |
  2011-03-28 |
  SuperB_DCH |
  Giuseppe Finocchiaro |
  6 |
  7 |
  0.0 |
  500.0 |
  750.0 |
  Electron |
  1.0 |
  1000.0 |
  In condivisione con c-speed |
  Co-user |
  BTF |
2011-03-21 |
2011-03-24 |
C-SPEED |
Marcello Piccolo |
6 |
3 |
0.0 |
500.0 |
500.0 |
Electron |
1.0 |
3.0 |
|
Main user |
  BTF |
2011-03-28 |
2011-04-04 |
BTF |
Giovanni Mazzitelli |
6 |
7 |
0.0 |
500.0 |
500.0 |
Electron |
1.0 |
1000.0 |
sostituzione tavolo BTF e run neutroni per caratterizzazione sorgente neutroni |
Main user |
  BTF |
2011-04-04 |
2011-04-11 |
SIDDHARTA/AMADEU |
Catalina Petrascu |
6 |
7 |
0.0 |
500.0 |
500.0 |
Electron |
1.0 |
1000.0 |
this period is asked in order to integrated the period we could not take data in March 2011 assigned period due to LINAC failure [broken cathode] |
Main user |
  BTF |
2011-04-11 |
2011-04-18 |
RAPID |
Leonello Servoli |
6 |
7 |
0.0 |
500.0 |
500.0 |
Electron |
1.0 |
1000.0 |
Beam test of CMOS pixel detectors for tracking.
Measurement of detector response. |
Main user |
  BTF |
2011-04-18 |
2011-04-25 |
FIRST |
Vincenzo Patera |
6 |
7 |
0.0 |
500.0 |
500.0 |
Electron |
1.0 |
1000.0 |
|
Main user |
  BTF |
2011-04-25 |
2011-05-02 |
BTF_NRCA |
Antonino Pietropaolo |
6 |
7 |
0.0 |
500.0 |
500.0 |
Electron |
1.0 |
1000.0 |
We intend to use the n@BTF facility for our measurments. |
Main user |
  BTF |
2011-05-02 |
2011-05-16 |
CsI R&D |
Claudia Cecchi |
6 |
14 |
0.0 |
50.0 |
500.0 |
Electron |
1.0 |
1000.0 |
|
Main user |
  BTF |
2011-05-16 |
2011-05-23 |
BES-III |
Alessandro Calcaterra |
6 |
7 |
0.0 |
500.0 |
500.0 |
Electron |
1.0 |
1000.0 |
test del minicalorimetro per BES-III |
Main user |
  BTF |
2011-05-23 |
2011-05-30 |
SuperB_DCH |
Giuseppe Finocchiaro |
6 |
7 |
0.0 |
500.0 |
750.0 |
Electron |
1.0 |
1000.0 |
Test su prototipi di camera a drift per studio Cluster Counting [broken cathode] |
Cancelled |
|
2011-05-30 |
2011-06-06 |
C-SPEED |
Marcello Piccolo |
6 |
7 |
0.0 |
500.0 |
500.0 |
Electron |
1.0 |
3.0 |
[broken cathode] |
Cancelled |
|
2011-06-06 |
2011-06-13 |
BTF_NRCA |
Antonino Pietropaolo |
6 |
7 |
0.0 |
500.0 |
500.0 |
Electron |
1.0 |
1000.0 |
[broken cathode] |
Cancelled |
|
2011-06-13 |
2011-06-23 |
TO_ASIC |
Leonello Servoli |
6 |
10 |
0.0 |
500.0 |
500.0 |
Electron |
1.0 |
1000.0 |
Test di strutture prototipali di sensori a pixel realizzati in tecnologia CMOS a 90 nm [broken cathode] |
Cancelled |
|
2011-06-23 |
2011-06-30 |
BES-III |
Alessandro Calcaterra |
6 |
7 |
0.0 |
500.0 |
500.0 |
Electron |
1.0 |
1000.0 |
test minicalorimetro in avanti per BES-III [broken cathode] |
Cancelled |
|
2011-06-30 |
2011-07-10 |
AMY |
Valerio Verzi |
6 |
10 |
10.0 |
350.0 |
750.0 |
Electron |
999.9 |
1.0e+7 |
Misura di radiazione al GHZ emessa da fasci di elettroni [broken cathode] |
Cancelled |
|
2011-07-11 |
2011-07-17 |
JLAB12-Genova |
Marco Battaglieri |
6 |
6 |
999.9 |
25.0 |
750.0 |
Electron |
1.0 |
1000.0 |
Test prototipo calorimetro PbWO-II per CLAS12 [broken cathode] |
Cancelled |
|
2011-10-17 |
2011-10-24 |
JLAB12-Genova |
Marco Battaglieri |
6 |
7 |
0.0 |
500.0 |
500.0 |
Electron |
1.0 |
1000.0 |
il roll out del test deve lasciare spazio venerd́ 21 all'istallazione di AMY (smontaggio muri radioprotezione, etc) [broken cathode] |
Cancelled |
|
2011-10-24 |
2011-11-07 |
AMY |
Valerio Verzi |
6 |
14 |
0.0 |
350.0 |
750.0 |
Electron |
999.9 |
1.0e+7 |
Misura di radiazione al GHZ emessa da fasci di elettroni [broken cathode] |
Cancelled |
|
2011-11-07 |
2011-11-17 |
RICCE |
Denis DAUVERGNE |
6 |
10 |
0.0 |
500.0 |
500.0 |
Electron |
1.0 |
1000.0 |
Actually, two periods of 3-4 days each, separated by one week end, would probably optimize our chances of success. |
Main user |
  BTF |
2011-11-17 |
2011-11-21 |
REPSI |
Srdjan Petrovic |
8 |
4 |
0.0 |
100.0 |
100.0 |
Electron |
1.0 |
1000.0 |
|
Main user |
  BTF |
2011-11-21 |
2011-11-24 |
BTF_NRCA |
Antonino Pietropaolo |
8 |
3 |
0.0 |
500.0 |
500.0 |
Electron |
1.0 |
1000.0 |
|
Cancelled |
|
2011-11-21 |
2011-12-05 |
AMY |
Valerio Verzi |
6 |
14 |
0.0 |
500.0 |
500.0 |
Electron |
1.0 |
1000.0 |
|
Main user |
  BTF |
2011-11-24 |
2011-11-28 |
NESCOFI@BTF |
Roberto Bedogni |
4 |
4 |
0.0 |
500.0 |
500.0 |
Electron |
1.0 |
1000.0 |
|
Cancelled |
|
2011-11-28 |
2011-12-05 |
SuperB_DCH |
Giuseppe Finocchiaro |
6 |
7 |
0.0 |
750.0 |
750.0 |
Electron |
1.0 |
1000.0 |
Test su prototipi di camera a drift per studio Cluster Counting |
Cancelled |
|
2011-12-05 |
2011-12-19 |
SIDDHARTA/AMADEU |
Catalina Petrascu |
6 |
14 |
0.0 |
500.0 |
500.0 |
Electron |
1.0 |
1000.0 |
period asked to be able to perform the plan we proposed for April 2011 measurements and could not do, integrated with new measurements |
Main user |
  BTF |
2011-12-19 |
2011-12-23 |
RAPID_1 |
L. Servoli |
3 |
4 |
0.0 |
500.0 |
500.0 |
Electron |
1.0 |
1000.0 |
|
Main user |
  BTF |