Start End User Group Leader Rollin/out (h) beam (days) dose Min. Energy Max. Energy Particle Min. Mult. Max. Mult. Info Priority Beamline
2011-02-14 2011-02-21 TPS Alessandro Paoloni 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 Main user   BTF
2011-02-21 2011-03-07 SIDDHARTA/AMADEU Catalina Petrascu 6 14 0.0 500.0 500.0 Electron 1.0 1000.0 test of detectors for SIDDHARTA2 and AMADEUS Main user   BTF
  2011-03-07   2011-03-21   RAINPC   Srdjan Petrovic   10   14   0.0   500.0   500.0   Positron   1.0   1000.0   The avaible beam time will be also used by Dr Yuri Chesnokov as a second user for his VEER project.   Co-user   BTF
2011-03-07 2011-03-21 VEER Yury Chesnokov 5 14 999.9 100.0 500.0 Positron 1.0 1000.0 we have to work as co -users with RAINPC project Main user   BTF
  2011-03-21   2011-03-28   SuperB_DCH   Giuseppe Finocchiaro   6   7   0.0   500.0   750.0   Electron   1.0   1000.0   In condivisione con c-speed   Co-user   BTF
2011-03-21 2011-03-24 C-SPEED Marcello Piccolo 6 3 0.0 500.0 500.0 Electron 1.0 3.0 Main user   BTF
2011-03-28 2011-04-04 BTF Giovanni Mazzitelli 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 sostituzione tavolo BTF e run neutroni per caratterizzazione sorgente neutroni Main user   BTF
2011-04-04 2011-04-11 SIDDHARTA/AMADEU Catalina Petrascu 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 this period is asked in order to integrated the period we could not take data in March 2011 assigned period due to LINAC failure [broken cathode] Main user   BTF
2011-04-11 2011-04-18 RAPID Leonello Servoli 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 Beam test of CMOS pixel detectors for tracking. Measurement of detector response. Main user   BTF
2011-04-18 2011-04-25 FIRST Vincenzo Patera 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 Main user   BTF
2011-04-25 2011-05-02 BTF_NRCA Antonino Pietropaolo 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 We intend to use the n@BTF facility for our measurments. Main user   BTF
2011-05-02 2011-05-16 CsI R&D Claudia Cecchi 6 14 0.0 50.0 500.0 Electron 1.0 1000.0 Main user   BTF
2011-05-16 2011-05-23 BES-III Alessandro Calcaterra 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 test del minicalorimetro per BES-III Main user   BTF
2011-05-23 2011-05-30 SuperB_DCH Giuseppe Finocchiaro 6 7 0.0 500.0 750.0 Electron 1.0 1000.0 Test su prototipi di camera a drift per studio Cluster Counting [broken cathode] Cancelled
2011-05-30 2011-06-06 C-SPEED Marcello Piccolo 6 7 0.0 500.0 500.0 Electron 1.0 3.0 [broken cathode] Cancelled
2011-06-06 2011-06-13 BTF_NRCA Antonino Pietropaolo 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 [broken cathode] Cancelled
2011-06-13 2011-06-23 TO_ASIC Leonello Servoli 6 10 0.0 500.0 500.0 Electron 1.0 1000.0 Test di strutture prototipali di sensori a pixel realizzati in tecnologia CMOS a 90 nm [broken cathode] Cancelled
2011-06-23 2011-06-30 BES-III Alessandro Calcaterra 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 test minicalorimetro in avanti per BES-III [broken cathode] Cancelled
2011-06-30 2011-07-10 AMY Valerio Verzi 6 10 10.0 350.0 750.0 Electron 999.9 1.0e+7 Misura di radiazione al GHZ emessa da fasci di elettroni [broken cathode] Cancelled
2011-07-11 2011-07-17 JLAB12-Genova Marco Battaglieri 6 6 999.9 25.0 750.0 Electron 1.0 1000.0 Test prototipo calorimetro PbWO-II per CLAS12 [broken cathode] Cancelled
2011-10-17 2011-10-24 JLAB12-Genova Marco Battaglieri 6 7 0.0 500.0 500.0 Electron 1.0 1000.0 il roll out del test deve lasciare spazio venerd́ 21 all'istallazione di AMY (smontaggio muri radioprotezione, etc) [broken cathode] Cancelled
2011-10-24 2011-11-07 AMY Valerio Verzi 6 14 0.0 350.0 750.0 Electron 999.9 1.0e+7 Misura di radiazione al GHZ emessa da fasci di elettroni [broken cathode] Cancelled
2011-11-07 2011-11-17 RICCE Denis DAUVERGNE 6 10 0.0 500.0 500.0 Electron 1.0 1000.0 Actually, two periods of 3-4 days each, separated by one week end, would probably optimize our chances of success. Main user   BTF
2011-11-17 2011-11-21 REPSI Srdjan Petrovic 8 4 0.0 100.0 100.0 Electron 1.0 1000.0 Main user   BTF
2011-11-21 2011-11-24 BTF_NRCA Antonino Pietropaolo 8 3 0.0 500.0 500.0 Electron 1.0 1000.0 Cancelled
2011-11-21 2011-12-05 AMY Valerio Verzi 6 14 0.0 500.0 500.0 Electron 1.0 1000.0 Main user   BTF
2011-11-24 2011-11-28 NESCOFI@BTF Roberto Bedogni 4 4 0.0 500.0 500.0 Electron 1.0 1000.0 Cancelled
2011-11-28 2011-12-05 SuperB_DCH Giuseppe Finocchiaro 6 7 0.0 750.0 750.0 Electron 1.0 1000.0 Test su prototipi di camera a drift per studio Cluster Counting Cancelled
2011-12-05 2011-12-19 SIDDHARTA/AMADEU Catalina Petrascu 6 14 0.0 500.0 500.0 Electron 1.0 1000.0 period asked to be able to perform the plan we proposed for April 2011 measurements and could not do, integrated with new measurements Main user   BTF
2011-12-19 2011-12-23 RAPID_1 L. Servoli 3 4 0.0 500.0 500.0 Electron 1.0 1000.0 Main user   BTF