[Prev][Next][Index][Thread]

FINUDA shutdown



Dear Colleagues,
FINUDA ended data daking with beams for year 2003 at 07:34 of December
23,with run FINU01053, trigger HYP. Soon after, another run was performed
with no beams, m.field ON: COSM04551, trigger Orfino*Orfone, ended at
09:23.
Then FINUDA shutdown for 2003 was performed. The magnetic field turned off.
The gas detectors have been left with flux of inert gases.
The electronics both in pit and in control room switched off, a part that
controlling the gas fluxes.
HV and low voltages are OFF.
All PCs in control room, incuding the disk server, have been correctly
switched off, in order to allow electricians to perform their activy now,
on December 23 and eventually 24th, and so avoiding the intervention of
january 7th with its mini-blackout in our control room.

 Best wishes to all of you of Marry Christmas and Happy New year.

            The RUN
                   CO-ordinator