[Prev][Next][Index][Thread]

NEWS & SHIFTS UPDATE




Dear Colleagues,

REMEMBER

We are now in condition of data daking.
This means that we have to record data
using always the trigger: HYP.OR.BHABHA in order to reach the foreseen
statistics in this first phase of FINUDA on DAFNE.
Also, we need to collect as much as possible statistics of "good" events
for the next, beginning of December 2003, meeting of the Scientific
Committee.
HENCE, any different trigger or any different usage of machine time
must be limited only to tests that are essential for the main scope
of the experiment.

During any shift a control of critical performances must be performed
using the monitor program and the event display. This is a DUTY of any
shifter. Soon it will be created also web page, called ONLINE QUALITY
CHECKS, to continuosly monitor sensitive quantities during data taking.

Moreover, during any shift a continuous  control of the count rates
and trip events of detectors is mandatory, acting promptly on the DAFNE
teams to inform that their actual handling of beams is dangerous for us
if trips and peak countings are too much frequent.

Any time machine development is under way, the following detectors
must be swhitched off before the dafne team starts:
microvertex and tofino. While the Drift Chambers must be put to a lower,
safe, HV configuration.

All groups are requested to inform L.Passamonti of any electronic
modules sent to repair using the LNF central store.
Moreover, the existing spares of critical modules should be clearly
marked in the armairs in control room.

In the week 17-23 November  two periods of machine development are
foreseen: the days of 18 and 20 November. In this periods in principle
the DAFNE hall could be accessible, but this it not granted. While it is
always possible to perform our tests in control room in such periods.
This situation will be repated also the next weeks, with at least one day
dedicated to machine development.
During the machine development, the shift is not suppressed, and shifters
have to stay in control room checking the leakage currents of microvertex,
acting toward dafne team if they become dangerous. 

Please,  use the following address to send the Shift Report:
	finudashift@lnf.infn.it

READ in the private FINUDA web page the "Procedure di
Sicurezza" (Safety Rules: an english version is in preparation).

	Shift Schedule Update

November	0-8		8-16		16-24

Tue.18		Bregant		Calvo		Gianotti		
		Dalena		DeMori		Pompili

Wed.19		Krasnoperov	Benussi		DeMori
		DiSanto		Dalena		Olin
				Beer		

Thu.20		Bianco		DiSanto		Dalena		
		Botta		Tomassini	Beer

Fri.21		Krasnperov	Bianco		DiSanto
		Olin		Botta		Derasmo

Sat.22		Dalena		Tomassini	Bianco
		Bregant		Pompili		Derasmo
		Beer		Olin

Sun.23		DiSanto		Dalena		Krasnoperov
		Bregant		Beer		Derasmo		

Mon.24		Piano		DiSanto		Dalena		
		Olin		Bregant		Palomba
				Beer		Lenti

Thu.25		Filippi		Bregant		Bertani
		Elia		Tomassini	Agnello

Wed.26		Palomba		Dalena		Filippi
		Lenti		Elia		Morra
				Beer

Tue.27		Agnello		Palomba		Dalena
		Krasnoperov	Lenti		Elia
				Olin		Beer

Fri.28		Filippi		Agnello		Palomba
		Morra		Bertani		Lenti

Sat.29		Dalena		Filippi		Agnello
		Elia		Morra		Lenti
				Olin

Sun.30		Palomba		Dalena		Piano	
		Fiore		Krasnoperov	Beer

		The RUN
		       CO-oordinator

 N.B.
In case of more shifters in a shift, the first name acts as Shift Leader