FINUDA RUN SUMMARY (November 2003):


RUN DATE
(dd/mm/yy)
START TIME
(hh:mm)
STOP TIME
(hh:mm)
TRIGGER EVENTS TOF ISIM & OSIM LMD STB B
FIELD
COMMENTS
FINU00104 01/11/03 02:00 03:04 HYP 929 ON ON ON ON ON
FINU00105 01/11/03 03:23 07:06 HYP 3805 ON ON ON ON ON
FINU00106 01/11/03 07:15 07:43 BHABHA 5001 ON ON ON ON ON
FINU00107 01/11/03 07:45 09:36 HYP 1792 ON ON ON ON ON
FINU00108 01/11/03 10:40 11:44 HYP 1183 ON ON ON ON ON LMDs trips due to DAPHNE
FINU00109 01/11/03 11:44 13:28 HYP 1899 ON ON ON ON ON
FINU00110 01/11/03 13:30 15:38 HYP 2187 ON ON ON ON ON
FINU00111 01/11/03 15:41 16:22 BHABHA 2450 ON ON ON ON ON
FINU00112 01/11/03 16:22 16:41 BHABHA 2501 ON ON ON ON ON
FINU00113 01/11/03 16:43 17:57 HYP 1537 ON ON ON ON ON
FINU00114 01/11/03 17:57 18:57 HYP 586 ON ON ON ON ON
FINU00115 01/11/03 19:11 20:17 HYP 1258 ON ON ON ON ON
FINU00116 01/11/03 20:38 22:45 HYP 2735 ON ON ON ON ON
FINU00117 01/11/03 23:02 23:56 BHABHA 5001 ON ON ON ON ON
FINU00118 01/11/03 23:58 01:07 HYP 618 ON ON ON ON ON
FINU00119 02/11/03 01:07 02:13 HYP 1023 ON ON ON ON ON
FINU00120 02/11/03 02:14 05:35 HYP 4095 ON ON ON ON ON all LMDs once in trip
FINU00121 02/11/03 05:36 07:31 HYP 2447 ON ON ON ON ON
FINU00122 02/11/03 07:33 08:09 BHABHA 5001 ON ON ON ON ON
FINU00123 02/11/03 08:11 09:03 HYP 1099 ON ON ON ON ON
FINU00124 02/11/03 09:06 10:58 HYP 2394 ON ON ON ON ON
FINU00126 02/11/03 11:34 12:21 HYP 1165 ON ON ON ON ON
FINU00127 02/11/03 12:52 13:18 BHABHA 4966 ON ON ON ON ON
FINU00129 02/11/03 13:33 18:07 HYP 6002 ON ON ON ON ON
FINU00130 02/11/03 18:09 19:10 HYP 1397 ON ON ON ON ON
FINU00131 02/11/03 19:27 20:48 HYP 549 ON ON ON ON ON
FINU00132 02/11/03 20:50 22:07 HYP 1238 ON ON ON ON ON
FINU00133 02/11/03 22:10 22:49 BHABHA 5024 ON ON ON ON ON
FINU00134 02/11/03 22:52 00:04 HYP 1487 ON ON ON ON ON
FINU00135 03/11/03 00:04 00:34 HYP 680 ON ON ON ON ON
FINU00136 03/11/03 00:52 03:36 HYP 4495 ON ON ON ON ON
FINU00137 03/11/03 03:37 05:11 HYP 2632 ON ON ON ON ON
COSM04515 04/11/03 20:06 09:38 BHABHA 6747 ON OFF ON ON OFF No beam
COSM04516 05/11/03 09:40 10:09 (.OR. FINO) .AND. (.OR. FONE) 4972 ON OFF ON ON OFF No beam
COSM04517 05/11/03 18:37 00:18 (BTB FINO) .AND. (.OR. FONE) 4617 ON ON ON ON OFF No beam
COSM04518 06/11/03 12:45 14:06 (.OR. FINO) .AND. (.OR. FONE) 12060 ON ON ON ON OFF No beam
COSM04519 06/11/03 14:42 16:11 (.OR. FINO) .AND. (.OR. FONE) 13370 ON ON ON ON OFF Problems with STB HV; no beam
COSM04520 06/11/03 16:13 17:38 (.OR. FINO) .AND. (.OR. FONE) 12373 ON ON ON ON OFF No beam
COSM04521 06/11/03 17:40 19:36 (BTB FINO) .AND. (.OR. FONE) 1849 ON ON ON ON OFF No beam
COSM04522 06/11/03 19:36 00:15 (BTB FINO) .AND. (.OR. FONE) 3854 ON ON ON ON OFF No beam
COSM04524 08/11/03 09:59 10:01 .OR. FONE 50000 ON OFF OFF OFF ON Tests in DAPHNE
FINU00140 09/11/03 23:42 23:53 HYP .OR. BHABHA 920 ON ON ON ON ON Unstable beam;
LMD 1o trip
FINU00141 10/11/03 00:11 01:00 HYP .OR. BHABHA 4431 ON ON ON ON ON Tofino HV from 12000 V to 14000 V
N.B. FROM NOW ON:
tofino 12p ch. not active; OSIM 4zA,4zB,5zA,5zB,5phi,6phi electronics damaged
FINU00142 10/11/03 01:10 02:15 HYP .OR. BHABHA 4568 ON ON ON ON ON LMD 6o trip
FINU00143 10/11/03 02:25 03:26 HYP .OR. BHABHA 4846 ON ON ON ON ON
FINU00144 10/11/03 04:24 05:14 HYP .OR. BHABHA 4012 ON ON ON ON ON
FINU00145 10/11/03 05:15 05:50 HYP .OR. BHABHA 3026 ON ON ON ON ON
FINU00146 10/11/03 06:19 07:16 HYP .OR. BHABHA 4086 ON ON ON ON ON
FINU00147 10/11/03 07:17 08:12 HYP .OR. BHABHA 4370 ON ON ON ON ON
FINU00148 10/11/03 08:12 09:20 HYP .OR. BHABHA 4858 ON ON ON ON ON
FINU00149 13/11/03 00:45 01:11 BHABHA 1753 ON ON ON ON ON LMD 3i +HV = 1600 V
LMD 3i -HV = 3200 V
N.B. FROM NOW ON:
low threshold (= 65) on tofino 12p and 12e
ISIM-OSIM modules 4, 5, 6 probably OFF
FINU00150 13/11/03 01:12 02:12 BHABHA 5732 ON ON ON ON ON LMD 3i +HV = 1600 V
LMD 3i -HV = 3200 V
ISIM-OSIM modules 4, 5, 6 probably OFF
FINU00151 13/11/03 02:27 04:14 HYP .OR. BHABHA 11005 ON ON ON ON ON LMD: configuration 3400_1850_HeBag loaded
ISIM-OSIM modules 4, 5, 6 probably OFF
FINU00152 13/11/03 04:16 05:58 HYP .OR. BHABHA 9998 ON ON ON ON ON ISIM-OSIM modules 4, 5, 6 probably OFF
FINU00153 13/11/03 06:09 08:01 HYP .OR. BHABHA 12448 ON ON ON ON ON ISIM-OSIM modules 4, 5, 6 probably OFF
COSM04529 13/11/03 17:39 18:08 BHABHA 419 ON OFF OFF OFF ON DAPHNE open for ISIM & OSIM check
FINU00155 13/11/03 21:22 21:27 (.OR. FINO) .AND. (.OR. FONE) 20000 ON OFF OFF OFF ON DAPHNE ON; waiting for OK to switch on ISIM, OSIM, LMD & STB
FINU00156 13/11/03 21:27 21:33 BTB K+ K- 20000 ON OFF OFF OFF ON DAPHNE ON; waiting for OK to switch on ISIM, OSIM, LMD & STB
FINU00157 13/11/03 21:42 21:43 BTB TOFINO 20000 ON OFF OFF OFF ON DAPHNE ON; waiting for OK to switch on ISIM, OSIM, LMD & STB
FINU00158 13/11/03 21:45 22:11 BHABHA 20000 ON OFF OFF OFF ON DAPHNE ON; waiting for OK to switch on ISIM, OSIM, LMD & STB
FINU00159 13/11/03 22:14 22:17 BHABHA 393 ON OFF OFF OFF ON DAPHNE ON; waiting for OK to switch on ISIM, OSIM, LMD & STB;
threshold changed on HPD1 (= 35)
FINU00160 13/11/03 22:18 22:21 BHABHA 758 ON OFF OFF OFF ON DAPHNE ON; waiting for OK to switch on ISIM, OSIM, LMD & STB;
threshold changed on HPD1 (= 30)
FINU00161 13/11/03 22:24 22:32 BHABHA 1602 ON OFF OFF OFF ON DAPHNE ON; waiting for OK to switch on ISIM, OSIM, LMD & STB;
threshold changed on HPD1 (= 30) and HPD7 (= 30)
FINU00175 14/11/03 07:07 08:38 HYP .OR. BHABHA 13016 ON ON ON ON ON
FINU00177 14/11/03 16:41 17:51 HYP .OR. BHABHA 13480 ON ON ON ON ON
CALI03208 14/11/03 17:53 18:05 LASER 5000 ON OFF OFF OFF ON
FINU00181 14/11/03 19:53 22:26 HYP .OR. BHABHA 26133 ON ON ON ON ON FROM NOW ON:
New MALU module (LeCroy 4532) in trigger
FINU00182 14/11/03 23:26 23:55 HYP .OR. BHABHA 1840 ON ON ON ON ON
FINU00183 15/11/03 01:23 03:25 HYP .OR. BHABHA 16093 ON ON ON ON ON
FINU00184 15/11/03 03:52 04:11 (.OR. FINO) .AND. (.OR. FONE) 30001 ON ON ON ON ON
FINU00185 15/11/03 04:12 04:25 (.OR. FINO) .AND. (.OR. FONE) 30034 ON ON ON ON ON
FINU00186 15/11/03 04:26 04:43 (.OR. FINO) .AND. (.OR. FONE) 30001 ON ON ON ON ON
FINU00187 15/11/03 04:43 05:02 (.OR. FINO) .AND. (.OR. FONE) 18581 ON ON ON ON ON
FINU00188 15/11/03 05:11 05:35 (.OR. FINO) .AND. (.OR. FONE) 42001 ON ON ON ON ON
FINU00189 15/11/03 05:37 05:51 (.OR. FINO) .AND. (.OR. FONE) 30001 ON ON ON ON ON
FINU00191 15/11/03 06:43 07:01 (.OR. FINO) .AND. (.OR. FONE) 30001 ON ON ON ON ON
FINU00192 15/11/03 07:09 08:10 HYP .OR. BHABHA 9009 ON ON ON ON ON
FINU00193 15/11/03 08:11 09:45 HYP .OR. BHABHA 12700 ON ON ON ON ON Stopped due to LMD trip
FINU00194 15/11/03 09:55 10:09 HYP .OR. BHABHA 633 ON ON ON ON ON Stopped due to problems on DAPHNE
FINU00196 15/11/03 11:36 12:30 HYP .OR. BHABHA 10266 ON ON ON ON ON Stopped due to LMD and tofino trips
FINU00197 15/11/03 12:40 13:11 HYP .OR. BHABHA 5010 ON ON ON ON ON Perhaps problem on LMD 1o HV
FINU00198 15/11/03 13:29 14:48 HYP .OR. BHABHA 15188 ON ON ON ON ON Perhaps problem on LMD 1o HV
FINU00199 15/11/03 14:49 15:03 HYP .OR. BHABHA 2579 ON ON ON ON ON Low HV on LMD 1o
FINU00200 15/11/03 15:04 16:19 HYP .OR. BHABHA 16809 ON ON ON ON ON
FINU00201 15/11/03 16:19 17:29 HYP .OR. BHABHA 15065 ON ON ON ON ON
FINU00202 15/11/03 17:29 18:44 HYP .OR. BHABHA 14961 ON ON ON ON ON LMD 6o trip during e+ injection
FINU00203 15/11/03 18:44 19:42 HYP .OR. BHABHA 12743 ON ON ON ON ON LMD 6o, 7o, 6i, 7i, 8i trip during e+ injection at the end run
FINU00204 15/11/03 19:46 21:02 HYP .OR. BHABHA 15406 ON ON ON ON ON
FINU00205 15/11/03 21:03 22:25 HYP .OR. BHABHA 17966 ON ON ON ON ON LMD 3o, 6o trip during e+ injection
FINU00206 15/11/03 22:25 23:47 HYP .OR. BHABHA 15093 ON ON ON ON ON
FINU00207 15/11/03 23:47 01:11 HYP .OR. BHABHA 17031 ON ON ON ON ON
FINU00208 16/11/03 01:11 02:26 HYP .OR. BHABHA 16807 ON ON ON ON ON
FINU00209 16/11/03 02:26 04:15 HYP .OR. BHABHA 20266 ON ON ON ON ON
FINU00212 16/11/03 05:08 06:28 HYP .OR. BHABHA 16440 ON ON ON ON ON
FINU00213 16/11/03 06:28 08:00 HYP .OR. BHABHA 16302 ON ON ON ON ON
FINU00214 16/11/03 08:13 09:31 HYP .OR. BHABHA 16079 ON ON ON ON ON Problem on STHVL1:05 up to 8:30
FINU00215 16/11/03 09:32 10:52 HYP .OR. BHABHA 15910 ON ON ON ON ON Stopped due to LMD and STB trips during e+ injection
FINU00216 16/11/03 11:00 11:03 HYP .OR. BHABHA 1017 ON ON ON ON ON Stopped due to LMD trip during e+ injection
FINU00217 16/11/03 11:25 11:55 HYP .OR. BHABHA 5391 ON ON ON ON ON Stopped due to LMD trip
FINU00218 16/11/03 12:27 12:37 HYP .OR. BHABHA 1512 ON ON ON ON ON Stopped to allow e+ and e- injection
FINU00219 16/11/03 12:48 13:55 HYP .OR. BHABHA 13584 ON ON ON ON ON LMD lower voltage from 13:10 to 13:17
FINU00220 16/11/03 13:57 14:22 HYP .OR. BHABHA 5800 ON ON ON ON ON Stopped to allow e+ and e- injection
FINU00221 16/11/03 14:36 15:06 HYP .OR. BHABHA 6618 ON ON ON ON ON Stopped to allow e+ and e- injection
FINU00222 16/11/03 15:29 16:05 HYP .OR. BHABHA 5748 ON ON ON ON ON Stopped due to LMD 6o trip during injection
FINU00223 16/11/03 16:08 17:41 HYP .OR. BHABHA 17492 ON ON ON ON ON
FINU00224 16/11/03 17:41 18:50 HYP .OR. BHABHA 16083 ON ON ON ON ON
FINU00225 16/11/03 18:50 19:08 HYP .OR. BHABHA 3124 ON ON ON ON ON
FINU00226 16/11/03 19:14 20:21 HYP .OR. BHABHA 15286 ON ON ON ON ON
FINU00227 16/11/03 20:22 20:52 HYP .OR. BHABHA 6126 ON ON ON ON ON
FINU00228 16/11/03 21:01 22:03 HYP .OR. BHABHA 12437 ON ON ON ON ON
FINU00229 16/11/03 22:34 23:54 HYP .OR. BHABHA 17640 ON ON ON ON ON
FINU00230 16/11/03 23:54 00:56 HYP .OR. BHABHA 17640 ON ON ON ON ON
FINU00231 17/11/03 00:57 01:23 HYP .OR. BHABHA 5760 ON ON ON ON ON Stopped due to beam dump
FINU00232 17/11/03 01:42 02:50 HYP .OR. BHABHA 16245 ON ON ON ON ON
FINU00233 17/11/03 03:08 04:12 HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00234 17/11/03 04:12 05:22 HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00235 17/11/03 05:39 06:49 HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00237 17/11/03 08:07 08:31 HYP .OR. BHABHA 4659 ON ON ON ON ON Stopped due to LMD trips during injection
FINU00238 17/11/03 08:34 09:06 HYP .OR. BHABHA 5528 ON ON ON ON ON Stopped due to LMD 1i trip during injection
FINU00239 17/11/03 09:10 10:14 HYP .OR. BHABHA 13835 ON ON ON ON ON
FINU00243 17/11/03 13:02 14:11 HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00244 17/11/03 14:11 14:22 HYP .OR. BHABHA 3314 ON ON ON ON ON Stopped for machine development
FINU00245 17/11/03 17:21 18:04 HYP .OR. BHABHA 10351 ON ON ON ON ON LMD 3i OFF
FINU00246 17/11/03 18:20 19:20 HYP .OR. BHABHA 15001 ON ON ON ON ON LMD 3i OFF at the begin of the run
FINU00247 17/11/03 19:24 20:50 HYP .OR. BHABHA 22350 ON ON ON ON ON
FINU00248 17/11/03 20:50 22:16 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00249 17/11/03 22:16 23:54 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00250 18/11/03 00:02 00:16 HYP .OR. BHABHA 3648 ON ON ON ON ON Problems on TOFONE; end run w/o TOFONE
FINU00251 18/11/03 00:28 01:30 HYP .OR. BHABHA 15186 ON ON ON ON ON TOFONE channel 54e- OFF
COSM04531 18/11/03 03:10 03:19 (.OR. FINO) .AND. (.OR. FONE) 1618 ON ON ON ON ON TOFONE channel 54e- OFF;
beam stopped to allow the access into the pit (problems on TOFONE)
FINU00252 18/11/03 03:40 05:01 HYP .OR. BHABHA 16443 ON ON ON ON ON TOFONE channel 54e- OFF
FINU00253 18/11/03 05:01 06:10 HYP .OR. BHABHA 15136 ON ON ON ON ON TOFONE channel 54e- OFF
FINU00254 18/11/03 06:11 07:26 HYP .OR. BHABHA 16675 ON ON ON ON ON TOFONE channel 54e- OFF
FINU00255 18/11/03 07:27 08:29 HYP .OR. BHABHA 15599 ON ON ON ON ON TOFONE channel 54e- OFF
FINU00256 18/11/03 08:29 08:43 HYP .OR. BHABHA 3401 ON ON ON ON ON TOFONE channel 54e- OFF;
stopped for machine development
N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. FROM NOW ON:
TRIGGER TIMING CHANGED
CALI03209 18/11/03 12:38 12:49 LASER 5000 ON OFF OFF OFF ON New TOF calibration run after new trigger timing
CALI03210 18/11/03 12:52 13:03 LASER 5000 ON OFF OFF OFF ON New TOF calibration run after new trigger timing;
test with +8 ns to COMMON STOP
CALI03211 18/11/03 13:05 13:17 LASER 5000 ON OFF OFF OFF ON New TOF calibration run after new trigger timing;
test with +16 ns to COMMON STOP
CALI03212 18/11/03 13:18 13:44 LASER 5000 ON OFF OFF OFF ON TOF calibration run after new trigger timing;
standard COMMON STOP
FINU00257 18/11/03 19:34 19:45 HYP .OR. BHABHA 6508 ON ON ON ON ON Problems with MALU 1
FINU00258 18/11/03 20:48 21:44 HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00259 18/11/03 21:46 22:29 HYP .OR. BHABHA 9616 ON ON ON ON ON
FINU00260 18/11/03 22:30 23:27 HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00261 18/11/03 23:33 23:49 (.OR. FINO) .AND. (.OR. FONE) 30001 ON ON ON ON ON
FINU00263 19/11/03 01:03 01:19 (.OR. FINO) .AND. (.OR. FONE) 30001 ON ON ON ON ON
FINU00264 19/11/03 01:19 01:42 (.OR. FINO) .AND. (.OR. FONE) 30001 ON ON ON ON ON
FINU00265 19/11/03 01:42 01:57 (.OR. FINO) .AND. (.OR. FONE) 30001 ON ON ON ON ON
FINU00266 19/11/03 02:00 02:50 (.OR. FINO) .AND. (.OR. FONE) 4230 ON ON ON ON ON
FINU00267 19/11/03 03:13 03:26 (.OR. FINO) .AND. (.OR. FONE) 30001 ON ON ON ON ON
FINU00268 19/11/03 03:37 03:50 (.OR. FINO) .AND. (.OR. FONE) 30001 ON ON ON ON ON
FINU00269 19/11/03 03:54 04:12 (.OR. FINO) .AND. (.OR. FONE) 30001 ON ON ON ON ON
FINU00270 19/11/03 04:12 04:25 (.OR. FINO) .AND. (.OR. FONE) 30001 ON ON ON ON ON
FINU00271 19/11/03 04:26 04:43 (.OR. FINO) .AND. (.OR. FONE) 30001 ON ON ON ON ON
FINU00272 19/11/03 04:43 04:56 (.OR. FINO) .AND. (.OR. FONE) 30001 ON ON ON ON ON
FINU00273 19/11/03 04:59 06:20 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00274 19/11/03 06:20 07:38 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00275 19/11/03 07:39 08:53 HYP .OR. BHABHA 20001 ON ON ON ON ON Hyp/Bhabha = 0.16
FINU00276 19/11/03 09:00 09:28 HYP .OR. BHABHA 7002 ON ON ON ON ON Hyp/Bhabha = 0.16
FINU00277 19/11/03 09:35 10:19 HYP .OR. BHABHA 11718 ON ON ON ON ON Hyp/Bhabha = 0.16
FINU00278 19/11/03 10:30 11:48 HYP .OR. BHABHA 20001 ON ON ON ON ON Hyp/Bhabha = 0.16
FINU00279 19/11/03 11:49 13:09 HYP .OR. BHABHA 20001 ON ON ON ON ON Hyp/Bhabha = 0.16
FINU00280 19/11/03 13:11 14:36 HYP .OR. BHABHA 20001 ON ON ON ON ON LMD gas mixture changed during the run:
He from 66% to 64%
iC4H10 from 34% to 36%
N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. FROM NOW ON:
LMD gas mixture set as follows:
He = 64%; iC4H10 = 36%
FINU00281 19/11/03 14:37 15:50 HYP .OR. BHABHA 20001 ON ON ON ON ON Hyp/Bhabha = 0.10
FINU00282 19/11/03 15:54 17:03 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00283 19/11/03 17:06 17:11 .OR. FONE 200001 ON OFF OFF OFF ON Test run
FINU00284 19/11/03 17:24 18:45 HYP .OR. BHABHA 23374 ON ON ON ON ON LMD 1i, 2i, 4i, 5i, 6i, 7i, 8i, 3o, 4o, 5o trips
FINU00285 19/11/03 18:46 20:18 HYP .OR. BHABHA 25032 ON ON ON ON ON LMD 1i, 2i, 4i, 5i, 6i, 3o, 4o, 6o trips
FINU00286 19/11/03 20:18 21:29 HYP .OR. BHABHA 20001 ON ON ON ON ON LMD 5i, 6i, 7i, 3o, 4o, 6o trips
FINU00287 19/11/03 21:30 22:36 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00289 19/11/03 22:50 00:00 HYP .OR. BHABHA 20001 ON ON ON ON ON tofino 1 and LMD 5i, 6i, 7i, 8i, 1o, 3o, 4o, 6o, 8o trips
FINU00290 20/11/03 00:01 01:17 HYP .OR. BHABHA 20001 ON ON ON ON ON LMD trips during e+ injection
LMD 3i +HV = 1600 V
LMD 3i -HV = 3200 V
FINU00291 20/11/03 01:18 02:22 HYP .OR. BHABHA 20001 ON ON ON ON ON LMD trips during e+ injection
LMD 3i +HV = 1600 V
LMD 3i -HV = 3200 V
FINU00292 20/11/03 02:22 03:32 HYP .OR. BHABHA 20001 ON ON ON ON ON LMD trips during e+ injection
LMD 3i +HV = 1600 V
LMD 3i -HV = 3200 V
FINU00293 20/11/03 03:33 04:40 HYP .OR. BHABHA 20001 ON ON ON ON ON LMD 3i +HV = 1600 V
LMD 3i -HV = 3200 V
FINU00294 20/11/03 04:41 05:48 HYP .OR. BHABHA 20001 ON ON ON ON ON LMD 3i +HV = 1600 V
LMD 3i -HV = 3200 V
FINU00297 20/11/03 07:00 08:14 HYP .OR. BHABHA 20001 ON ON ON ON ON Trips on all the LMD due to e+ beam loss
tofino 10e-, 12e- trips
LMD 3i +HV = 1800 V
LMD 3i -HV = 3200 V
FINU00298 20/11/03 08:15 09:25 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00299 20/11/03 09:27 10:39 HYP .OR. BHABHA 20001 ON ON ON ON ON
CALI03213 20/11/03 15:30 15:42 LASER 5001 ON OFF OFF OFF ON TOF calibration run; standard COMMON STOP
CALI03214 20/11/03 15:48 16:00 LASER 5001 ON OFF OFF OFF ON TOF calibration run; test with +8 ns to COMMON STOP
CALI03215 20/11/03 16:01 16:12 LASER 5001 ON OFF OFF OFF ON TOF calibration run; test with +16 ns to COMMON STOP
CALI03216 20/11/03 16:21 16:33 LASER 5001 ON OFF OFF OFF ON TOF calibration run; standard COMMON STOP
 

FINUDA Run Summary (from 21 Nov 2003 to 05 Dec 2003)

FINUDA Run Summary (from 06 Dec 2003 up to now)






Last update: Wed 26 Nov 2003 05:40 UTC

FINUDA RUN SUMMARY (from 21 November 2003 to 05 December 2003):


RUN DATE
(dd/mm/yy)
START TIME
(hh:mm)
STOP TIME
(hh:mm)
TRIGGER EVENTS TOF ISIM & OSIM LMD STB B
FIELD
COMMENTS
FINU00300 21/11/03 14:07 14:43 HYP .OR. BHABHA 2602 ON ON ON ON ON All tofino high tresholds lowered from 250 mV to 100 mV
FINU00302 21/11/03 15:31 16:23 HYP 4613 ON ON ON ON ON All tofino high tresholds set to 100 mV
FINU00303 21/11/03 18:41 22:15 HYP 19244 ON ON ON ON ON Tofino 8e+ high treshold = 80 mV;
tofino 8e- high treshold = 90 mV;
the remaining set to 100 mV
CALI03217 21/11/03 22:19 22:33 LASER 5001 ON OFF OFF OFF ON TOF calibration run
FINU00306 22/11/03 00:17 01:23 HYP 4469 ON ON ON ON ON Tofino high tresholds set to 100 mV
LMD standard configuration (+HV = 1850 V; -HV = 3400 V) loaded
N.B. NO FINU00306_form.txt produced !!!
FINU00307 22/11/03 01:43 02:23 HYP 2796 ON ON ON ON ON Tofino high tresholds set to 100 mV
LMD standard configuration (+HV = 1850 V; -HV = 3400 V) loaded
FINU00308 22/11/03 02:24 04:11 HYP 11219 ON ON ON ON ON Tofino high tresholds set to 100 mV
LMD standard configuration (+HV = 1850 V; -HV = 3400 V) loaded
FINU00310 22/11/03 04:40 05:30 HYP 4093 ON ON ON ON ON Tofino high tresholds set to 100 mV
LMD standard configuration (+HV = 1850 V; -HV = 3400 V) loaded
N.B. NO FINU00310_form.txt produced !!!
FINU00312 22/11/03 06:00 08:01 HYP 12337 ON ON ON ON ON Tofino high tresholds set to 100 mV
LMD standard configuration (+HV = 1850 V; -HV = 3400 V) loaded
FINU00313 22/11/03 08:03 08:51 HYP 5813 ON ON ON ON ON Stopped due to high common-mode noise in ISIM-OSIM
Tofino high tresholds set to 100 mV
FINU00315 22/11/03 09:05 11:39 HYP 9403 ON ON ON ON ON Tofino high tresholds set to 250 mV
Stopped to allow working on trigger (BHABHA setting didn't work)
FINU00316 22/11/03 13:45 14:25 BHABHA 10001 ON ON ON ON ON Trigger BHABHA repaired
tofino high tresholds set to 100 mV again
N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. FROM NOW ON:
all tofino high tresholds set to 100 mV
COSM04532 22/11/03 14:29 14:40 (.OR. FINO) .AND. (.OR. FONE) 10001 ON ON ON ON ON
FINU00317 22/11/03 14:45 15:25 HYP .OR. BHABHA 13018 ON ON ON ON ON Stopped due to DAQ error
FINU00318 22/11/03 15:43 16:09 HYP .OR. BHABHA 10001 ON ON ON ON ON
FINU00320 22/11/03 18:32 18:41 (.OR. FINO) .AND. (.OR. FONE) 15001 ON ON ON ON ON
FINU00321 22/11/03 18:47 19:29 HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00322 22/11/03 20:08 20:09 (.OR. FINO) .AND. (.OR. FONE) 40001 ON OFF OFF OFF ON Trigger test run;
MALU cable changed before the start
FINU00323 22/11/03 20:09 20:11 (.OR. FINO) .AND. (.OR. FONE) 65154 ON OFF OFF OFF ON Trigger test run
FINU00324 22/11/03 20:13 20:21 (.OR. FINO) .AND. (.OR. FONE) 15001 ON ON ON ON ON Trigger test run
FINU00325 22/11/03 20:27 20:39 BHABHA 5038 ON ON ON ON ON
FINU00326 22/11/03 20:41 21:35 HYP .OR. BHABHA 20001 ON ON ON ON ON Tofino high tresholds set to 100 mV
(except 8e+ to 80 mV; 8e- to 90 mV)
FINU00327 22/11/03 21:46 22:37 HYP .OR. BHABHA 20001 ON ON ON ON ON Tofino high tresholds set to 100 mV
FINU00328 22/11/03 22:38 23:37 HYP .OR. BHABHA 20001 ON ON ON ON ON Tofino high tresholds set to 100 mV
(except 8e+ to 80 mV; 8e- to 90 mV)
N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. N.B. FROM NOW ON:
Tofino 1 to 7 and 9 to 12 high thresholds set to 100 mV (both e+ and e- sides);
8e+ high threshold set to 80 mV;
8e- high threshold set to 90 mV
FINU00329 22/11/03 23:37 00:45 HYP .OR. BHABHA 26466 ON ON ON ON ON LMD trips
FINU00330 23/11/03 00:45 01:40 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00331 23/11/03 01:41 02:26 HYP .OR. BHABHA 15455 ON ON ON ON ON
FINU00332 23/11/03 02:29 03:07 HYP .OR. BHABHA 15007 ON ON ON ON ON
FINU00333 23/11/03 03:08 03:43 HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00334 23/11/03 03:44 04:35 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00335 23/11/03 04:35 05:33 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00336 23/11/03 05:34 06:30 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00337 23/11/03 06:32 07:26 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00338 23/11/03 07:27 08:30 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00339 23/11/03 08:34 09:27 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00340 23/11/03 09:31 10:25 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00341 23/11/03 10:25 10:36 HYP .OR. BHABHA 4968 ON ON ON ON ON
FINU00342 23/11/03 10:39 11:03 HYP 2910 ON ON ON ON ON
FINU00343 23/11/03 11:10 11:21 BHABHA 4615 ON OFF OFF OFF ON Trigger test run
Tofino 1e+, 1e-, 8e+, 8e- low tresholds set to 20 mV
FINU00344 23/11/03 11:25 11:38 (.OR. FINO) .AND. (.OR. FONE) 436263 ON OFF OFF OFF ON Trigger test run
FINU00345 23/11/03 13:53 14:00 (.OR. FINO) .AND. (.OR. FONE) 300001 ON OFF OFF OFF ON Trigger test run
FINU00346 23/11/03 14:04 14:44 HYP .OR. BHABHA 20001 ON ON ON ON ON Busy injection not enabled; data taken during injection
FINU00347 23/11/03 14:45 15:30 HYP .OR. BHABHA 20001 ON ON ON ON ON Busy injection not enabled; data taken during injection
FINU00348 23/11/03 15:39 16:34 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00349 23/11/03 16:37 19:21 HYP 20001 ON ON ON ON ON
FINU00350 23/11/03 19:29 20:15 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00351 23/11/03 20:16 21:03 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00352 23/11/03 21:03 21:50 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00353 23/11/03 21:50 22:41 HYP .OR. BHABHA 20565 ON ON ON ON ON
FINU00354 23/11/03 22:41 23:34 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00355 23/11/03 23:35 23:55 HYP .OR. BHABHA 9747 ON ON ON ON ON
FINU00356 23/11/03 23:59 00:40 HYP .OR. BHABHA 15892 ON ON ON ON ON
FINU00357 24/11/03 00:41 01:20 HYP .OR. BHABHA 15001 ON ON ON ON ON LMDs trip during e+ injection
FINU00358 24/11/03 01:35 02:21 HYP .OR. BHABHA 15001 ON ON ON ON ON LMDs trip (e- beam blow-up)
FINU00359 24/11/03 02:22 03:02 HYP .OR. BHABHA 17098 ON ON ON ON ON
FINU00360 24/11/03 03:02 03:37 HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00361 24/11/03 03:44 04:20 HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00362 24/11/03 04:20 04:48 HYP .OR. BHABHA 6180 ON ON ON ON ON Stopped due to e+ beam loss
(a DAFNE element does not work)
COSM04533 24/11/03 04:58 04:59 (.OR. FINO) .AND. (.OR. FONE) 1980 ON ON ON ON ON N.B.: e+ beam OFF, but not e- beam;
electron background acquired instead of cosmic rays
FINU00363 24/11/03 07:41 07:55 HYP .OR. BHABHA 6343 ON ON ON ON ON Start after the broken e+ line element was repaired;
OSIM 8 [15] ZB trip during e+ injection
FINU00364 24/11/03 08:00 08:46 HYP .OR. BHABHA 15003 ON ON ON ON ON
FINU00365 24/11/03

HYP .OR. BHABHA 15581 ON ON ON ON ON
FINU00366 24/11/03

HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00367 24/11/03

HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00368 24/11/03

HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00369 24/11/03

HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00370 24/11/03

HYP .OR. BHABHA 11448 ON ON ON ON ON Stopped due to e- beam blows
FINU00371 24/11/03

HYP .OR. BHABHA 4271 ON ON ON ON ON Stopped to recompile DAQ program
FINU00372 24/11/03

HYP .OR. BHABHA 15001 ON ON ON ON ON Delta RF = 0
FINU00373 24/11/03

HYP .OR. BHABHA 15001 ON ON ON ON ON Delta RF = +10 kHz
FINU00383 25/11/03 06:58
(.OR. FINO) .AND. (.OR. FONE) 15001 ON ON ON ON ON
COSM04534 25/11/03 07:23
(.OR. FINO) .AND. (.OR. FONE) 15001 ON ON ON ON ON
COSM04535 25/11/03 07:47 08:18 (.OR. FINO) .AND. (.OR. FONE) 15001 ON ON ON ON ON TOFONE 49e- OFF;
still beam (e+ = 10 mA, e- = 20 mA)
COSM04536 25/11/03 08:19 08:31 (.OR. FINO) .AND. (.OR. FONE) 5616 ON ON ON ON ON Stopped due to LMDs trip (iC4H10 bottle empty);
TOFONE 49e- OFF;
still beam (e+ = 10 mA, e- = 20 mA)
COSM04537 25/11/03 09:01 10:12 (.OR. FINO) .AND. (.OR. FONE) 11004 ON ON ON ON ON Stopped to enter the pit (TOFONE maintenance)
CALI03218 25/11/03 09:01 10:12 LASER 5001 ON ON ON ON ON TOF calibration run
FINU00384 26/11/03 20:21 20:24 HYP 998 ON ON ON ON ON
FINU00385 26/11/03 20:58 21:47 HYP 11395 ON ON ON ON ON
FINU00386 26/11/03 21:57 23:21 HYP 24921 ON ON ON ON ON
FINU00388 27/11/03 00:02 00:47 HYP 15001 ON ON ON ON ON
FINU00389 27/11/03 00:50 01:14 BHABHA 20001 ON ON ON ON ON
FINU00390 27/11/03 01:14 01:35 BHABHA 20001 ON ON ON ON ON
FINU00391 27/11/03 01:36 02:01 BHABHA 20001 ON ON ON ON ON
FINU00392 27/11/03 02:14 02:35 HYP 7460 ON ON ON ON ON
FINU00393 27/11/03 02:42 02:50 HYP 1926 ON ON ON ON ON
FINU00394 27/11/03 03:08 04:09 HYP 22286 ON ON ON ON ON
FINU00395 27/11/03 04:09 05:01 HYP 20001 ON ON ON ON ON
FINU00396 27/11/03 05:02 05:23 HYP 8593 ON ON ON ON ON
FINU00397 27/11/03 05:50 06:33 HYP 20250 ON ON ON ON ON
FINU00398 27/11/03 06:34 07:24 HYP 20001 ON ON ON ON ON
FINU00399 27/11/03 07:26 08:16 HYP 20001 ON ON ON ON ON
FINU00400 27/11/03 08:17 08:58 HYP 20001 ON ON ON ON ON
FINU00401 27/11/03 08:59 09:19 HYP 2797 ON ON ON ON ON Stopped due to e+ beam loss;
tofino and LMDs trips
FINU00402 27/11/03 09:30 09:35 HYP 2034 ON ON ON ON ON Stopped for trigger check
FINU00403 27/11/03 10:10 10:48 HYP 20001 ON ON ON ON ON
FINU00404 27/11/03 10:53 11:31 HYP 20001 ON ON ON ON ON
FINU00405 27/11/03 11:34 12:37 HYP 17226 ON ON ON ON ON Stopped due to e+ beam loss;
all LMDs trip
FINU00406 27/11/03 13:15 13:41 HYP 20001 ON ON ON ON ON Stopped due to e+ beam loss;
all LMDs trip
FINU00408 27/11/03 17:25 17:46 HYP 3209 ON ON ON ON ON Stopped due to LMDs trip;
TOFONE thresholds = 48 mV
FINU00409 27/11/03 18:15 18:21 HYP 705 ON ON ON ON ON LMD -HV = 3400 V; +HV = 1800 V;
TOFONE thresholds = 48 mV
FINU00410 27/11/03 20:47 21:35 HYP 15194 ON ON ON ON ON LMD -HV = 3400 V; +HV = 1850 V;
TOFONE thresholds = 48 mV
FINU00412 27/11/03 21:50 22:11 HYP 34313 ON ON ON ON ON Trigger test run; MALU disabled
FINU00414 27/11/03 22:51 23:23 BTB K+K- 45827 ON ON ON ON ON Tofino slabs 2 and 8 with low threshold = 250 mV
FINU00415 27/11/03 23:28 23:41 BTB K+K- 20139 ON ON ON ON ON Tofino slabs 2 and 8 with low threshold = 250 mV
FINU00421 28/11/03 04:47 05:18 HYP 22144 ON ON ON ON ON
FINU00422 28/11/03 05:21 05:35 HYP 4109 ON ON ON ON ON
FINU00423 28/11/03 05:35 06:41 HYP 15001 ON ON ON ON ON
FINU00425 28/11/03 06:57 07:49 HYP 15077 ON ON ON ON ON
FINU00429 28/11/03 13:18 14:34 HYP 20004 ON ON ON ON ON
FINU00430 28/11/03 14:45 15:22 HYP 9249 ON ON ON ON ON
FINU00433 28/11/03 15:54 16:21 HYP .OR. BHABHA 17266 ON ON ON ON ON
FINU00435 28/11/03 16:55 17:18 HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00436 28/11/03 18:29 18:52 HYP .OR. BHABHA 21696 ON ON ON ON ON
FINU00439 28/11/03 19:15 19:30 HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00440 28/11/03 19:38 19:52 HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00441 28/11/03 19:53 20:09 HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00442 28/11/03 20:09 20:23 HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00443 28/11/03 20:25 20:42 HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00444 28/11/03 20:42 20:57 HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00445 28/11/03 20:57 21:14 HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00446 28/11/03 21:15 21:41 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00449 29/11/03 01:10 01:23 HYP .OR. BHABHA 698 ON ON ON ON ON Trigger BHABHA doesn't work;
TOFONE thresholds = 192 mV
FINU00451 29/11/03 01:38 04:50 HYP 10257 ON ON ON ON ON Stopped due to LMDs trip;
TOFONE thresholds = 192 mV
FINU00454 29/11/03 05:13 06:48 HYP 3530 ON ON ON ON ON Stopped due to e- beam lost;
tofino and LMDs trip;
TOFONE thresholds = 192 mV
FINU00455 29/11/03

HYP 9338 ON ON ON ON ON Stopped due to DAFNE problems
FINU00456 29/11/03 16:00 16:23 HYP .OR. BHABHA 22344 ON ON ON ON ON
CALI03225 29/11/03 16:25 16:37 LASER 5001 ON OFF OFF OFF ON TOF calibration run
FINU00457 29/11/03 16:43 17:29 HYP .OR. BHABHA 20060 ON ON ON ON ON
FINU00459 29/11/03 17:47 18:28 HYP .OR. BHABHA 12018 ON ON ON ON ON Test run: tofino MT 1, 3 high and low thresholds OFF
FINU00460 29/11/03 19:13 19:52 HYP .OR. BHABHA 20001 ON ON ON ON ON Tofino: slab 1 MT exchanged with slab2 MT
FINU00461 29/11/03 19:53 20:32 HYP .OR. BHABHA 20189 ON ON ON ON ON Tofino: slab 1 MT exchanged with slab2 MT
FINU00462 29/11/03 21:05 22:05 HYP .OR. BHABHA 20001 ON ON ON ON ON Tofino: MTs restored as before run 460;
then slab 2 MT exchanged with slab 3 MT
FINU00466 30/11/03 00:09 00:34 HYP .OR. BHABHA 13398 ON OFF ON ON ON Tofino: slab 2 MT exchanged with slab 3 MT
ISIM and OSIM not acquired
FINU00467 30/11/03 00:50 01:21 HYP .OR. BHABHA 20433 ON OFF ON ON ON Tofino: slab 2 MT exchanged with slab 3 MT
ISIM and OSIM not acquired
FINU00469 30/11/03 02:42 03:16 HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00471 30/11/03 03:30 04:06 HYP .OR. BHABHA 15001 ON ON ON ON ON
FINU00472 30/11/03 04:40 05:31 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00473 30/11/03 05:41 06:29 HYP .OR. BHABHA 20001 ON ON ON ON ON
FINU00474 30/11/03 06:57 07:24 HYP .OR. BHABHA 17173 ON ON ON ON ON Tofino and LMD trips
FINU00475 30/11/03 07:34 08:24 HYP .OR. BHABHA 20001 ON ON ON ON ON INJ cable not connected;
data taking during injection
tofino: HPD e-side disabled;
HPD p-side connected both sides
FINU00476 30/11/03 08:32 09:18 HYP .OR. BHABHA 20001 ON ON ON ON ON INJ cable not connected;
data taking during injection
tofino: HPD e-side disabled;
HPD p-side connected both sides
FINU00478 30/11/03 09:32 10:25 HYP .OR. BHABHA 20001 ON ON ON ON ON Tofino: HPD e-side disabled;
HPD p-side connected both sides
FINU00479 30/11/03 10:35 11:21 HYP .OR. BHABHA 20001 ON ON ON ON ON tofino: HPD e-side disabled;
HPD p-side connected both sides
FINU00480 30/11/03 11:22 12:05 HYP .OR. BHABHA 14891 ON ON ON ON ON Tofino: HPD e-side disabled;
HPD p-side connected both sides
FINU00481 30/11/03 12:36 12:41 HYP .OR. BHABHA 2175 ON OFF OFF OFF ON Tofino: HPD e-side disabled;
HPD p-side connected both sides;
slab 7 MT exchanged with slab 8 MT
FINU00482 30/11/03 14:16 15:45 HYP .OR. BHABHA 8362 ON OFF OFF OFF ON Tofino: HPD e-side disabled;
HPD p-side connected both sides;
slab 7 MT exchanged with slab 8 MT
FINU00484 30/11/03 18:22 19:38 HYP .OR. BHABHA 16903 ON OFF OFF OFF ON Tofino wiring rotated in order to study the event suppression;
tofino cabling map:
slab 1 --> wire 4
slab 2 --> wire 5
slab 3 --> wire 6
slab 4 --> wire 7
slab 5 --> wire 8
slab 6 --> wire 9
slab 7 --> wire 10
slab 8 --> wire 11
slab 9 --> wire 12
slab 10 --> wire 1
slab 11 --> wire 2
slab 12 --> wire 3
FINU00485 30/11/03 20:08 20:57 HYP .OR. BHABHA 20008 ON OFF OFF OFF ON Tofino cabling rotated as described in run 484
FINU00486 30/11/03 20:57 21:46 HYP .OR. BHABHA 22366 ON OFF OFF OFF ON Tofino cabling rotated as described in run 484
FINU00487 30/11/03 21:50 22:17 HYP .OR. BHABHA 13261 ON OFF OFF OFF ON Tofino cabling rotated as described in run 484
FINU00488 30/11/03 22:58 23:12 HYP 1176 ON OFF OFF OFF ON Tofino cabling rotated as described in run 484
FINU00489 30/11/03 23:13 23:38 HYP 1743 ON OFF OFF OFF ON Tofino cabling rotated as described in run 484;
slab 1 low threshold = 150 mV
FINU00490 30/11/03 23:43 23:46 BHABHA 188 ON OFF OFF OFF ON Tofino cabling rotated as described in run 484;
low threshold = 250 mV for all tofino slabs
FINU00491 30/11/03 23:46 00:40 BHABHA 3354 ON OFF OFF OFF ON Tofino cabling rotated as described in run 484;
low threshold = 250 mV for all tofino slabs
 

FINUDA Run Summary (October 2003)

FINUDA Run Summary (December 2003)

FINUDA Run Summary (from January 10, 2004 up to now)






To update the run summary, at the end of each shift, please send the run information to Maurizio:

Maurizio.Palomba@ba.infn.it






Last update: Tue 09 Dec 2003 12:00 UTC