New hardware (A1303 PCI CAENET controller and RAID-mirroring system) (completed: February 2006)
TOFINO Slow-Control:
Detector debugging tools (expert user commands) (completed: March 2006)
Detector status monitoring (completed: May 2006)
Detector control (standard user commands) (completed: June 2006)
Detector automatic setup (standard user command) (completed: June 2006)
Detector trip recovery (standard user command) (completed: September 2006)
Communication with SCC (Slow-Control-Center) (completed: September 2006)
No changes are foreseen (with respect
to the system used during the previous data-taking).
A new
machine has been provided and completely installed: waiting for the
detector installation (May 2006).
New hardware (A1303 PCI CAENET controller and RAID-mirroring system) (completed: February 2006)
LMD Slow-Control:
Detector debugging tools (expert user commands) (completed: May 2006)
Detector status monitoring (completed: May 2006)
Detector control (standard user commands) (completed: June 2006)
Detector configuration manager (standard user command) (completed: September 2006)
Detector manual trip recovery (standard user command) (completed: September 2006)
Communication with SCC (Slow-Control-Center) (completed: October 2006)
New hardware (A1303 PCI CAENET controller and new machine) (completed: February 2006)
STB Slow-Control:
Detector debugging tools (expert user commands) (completed: April 2006)
Detector status monitoring (completed: April 2006)
Detector control (standard user commands) (completed: September 2006)
Detector automatic setup (standard user command) (completed: October 2006)
Detector manual trip recovery (standard user command) (completed: October 2006)
Communication with SCC (Slow-Control-Center) (completed: November 2006)
New hardware (A1303 PCI CAENET controller and RAID-mirroring system) (completed: February 2006)
TOFONE Slow-Control:
Detector debugging tools (expert user commands) (completed: March 2006)
Detector status monitoring (completed: March 2006)
Detector control (standard user commands) (completed: April 2006)
Detector automatic setup (standard user command) (completed: April 2006)
Detector manual trip recovery (standard user command) (completed: April 2006)
Communication with SCC (Slow-Control-Center) (completed: April 2006)
The SCC is aimed at receiving SlowControl-raw-events from every SlowControl machine via UDP socket and encode them into a unique socket string (adding a common header), which will be sent to DAQ and stored in raw data.
Slow-Raw-Event (from every detector) reception and visualisation (completed: May 2006)
Global-Slow-Raw-Event to DAQ (not used)
Complete GUI for browsing raw-information (completed: November 2006)
Global-Slow-Raw-Event storage (local raw-files) (completed: January 2007)
Complete data-browsing for ISIM/OSIM bias-currents (local text-files) (completed: September 2007)
last update: April 11, 2007